| 1. | C scsc cost schedule control system criteria 成本控制系统标准 |
| 2. | Cost schedule models for contract works 进度绩效模型研究 |
| 3. | Cost schedule status report " c ssr 成本进度状态报告 |
| 4. | C ssr cost schedule status report 成本进度状态报告 |
| 5. | Responsibilities will include for documentation of projects , overseeing the work of projects , leading and working within a team , adherence to time frames , and cost schedules 职责包括项目文件整理,项目的监督工作,团队的领导,对工程时间框架的控制和成本明细。 |
| 6. | Give cost and time data for project tasks , the six sigma black belt should be able to compute the cost of normal and crash schedules and the minimum total cost schedule 给出项目任务的成本和时间数据, 6西格玛黑带应能计算出正常的和紧急加快的生产费用表以及最小的生产总费用表。 |
| 7. | Firstly , we use the algorithm of the least cost scheduling in network plan . and a useful heuristic model described as the latest finish time model for resources scheduling is selected to solve the resource optimization , which based on investigation of heuristic methods of resource - constrained activity network 首先对网络计划进行工期? ?费用优化,然后基于对多资源约束网络计划的启发式方法分析的基础上,选择一种简捷实用的启发式方法? ?最迟完成时间( lft )判断法,对网络计划进行多资源综合协调。 |